Home / Resources / Case Studies & Project Gallery
Case Studies & Project Gallery

Real tanks. Real transformations.

Numbers and descriptions only go so far — sometimes you need to see the work. Our project gallery showcases before-and-after photos and write-ups from refurbishment, repair, and customization projects across our shop floor, so you can see exactly what “better than new” looks like.
1,000+
Tanks customized
20+
yrs of project history
40+
Countries served
Case study 01Customization

Nine-tank fleet build-out for a specialty-chemicals operator

Custom manways, upgraded safety accessories, and product-specific fittings across a fleet of nine ISO containers — delivered on spec and on schedule. (Sample copy — replace with the real project write-up.)
Case study 02Refurbishment

Rollover recovery: from write-off to recertified

A rolled tank arrived as a candidate for scrap. Frame straightening, shell repair, repaint, and full recertification brought it back into service. (Sample copy — see Services/Refurbishment/Images: 027319-before.jpg / 969548-after.jpg.)
Case study 03Lined Tanks

High-purity lining preserved through a clean-room repair

Valve and fitting repairs on a ChemLine-lined high-purity container, completed in our atmosphere-controlled clean room without compromising lining integrity. (Sample copy — replace with the real project write-up.)
Project gallery

Straight from the shop floor.

What are we working on right now? Take a look: